Avaada Energy to implement 2GW of open access PV plants in India

Facebook
Twitter
LinkedIn
Reddit
Email
These PV installations are being built for corporations who are looking to optimize their operating costs and meet their green energy needs through solar, rooftop and hybrid-energy solutions. Image: Robert Scoble / Flickr

Indian IPP Avaada Energy is in the process of implementing 2GW of open access solar plants in states like Maharashtra, Tamil Nadu, Haryana, Karnataka and Orissa. Avaada currently has a portfolio of over 500MW of open access solar plants for various commercial and industrial companies. 

These PV installations are being built for corporations who are looking to optimize their operating costs and meet their green energy needs through solar, rooftop and hybrid-energy solutions. Usually, a corporation can save up to 30-50% of its electricity costs by switching to open access solar solutions. 

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Vineet Mittal, chairman of Avaada Energy, said: “Avaada continues to contribute to India’s green energy revolution led by Honorable PM Narendra Modi. Open access is a highly credible and economical solution for corporates looking to bring down their electricity bills and CO2 emissions significantly. We are already working with some of the leading MNCs who have committed to switch to 100% renewables.”

Avaada Energy has raised approximately US$145 million from investors such as the Asian Development Bank (ADB), Germany’s Deutsche Entwicklungs- und Investitionsgesellschaft (DEG), Dutch Development Bank, Netherlands Development Finance Company (FMO) and others. The company plans to develop a 5GW renewable energy portfolio in Asia and Africa by 2022.

Read Next

September 4, 2025
India’s Goods and Services Tax (GST) Council, the joint forum of the Centre and States, has reduced the GST rate on renewable energy components from 12% to 5%. 
September 4, 2025
Indian solar manufacturer Waaree Energies has acquired a 64% equity stake in power transformer manufacturing company Kotsons.
September 3, 2025
India has added 2.8GW of rooftop solar in H1 2025, a 158% year-on-year surge from just 1.1GW in the same period last year.
September 1, 2025
The US International Trade Commission (ITC) has voted to continue the investigation on imported solar cells from India, Indonesia and Laos.
August 28, 2025
Indian solar manufacturing firm INA Solar has broken ground on its fourth 4.5GW cell production plant in Narmadapuram, Madhya Pradesh.
August 26, 2025
Jakson Engineers is investing over INR80 billion (US$912.5 million) to set up a 6GW integrated solar module, cell, and wafer plant.

Subscribe to Newsletter

Upcoming Events

Solar Media Events
September 16, 2025
Athens, Greece
Solar Media Events
September 30, 2025
Seattle, USA
Solar Media Events
October 1, 2025
London, UK
Solar Media Events
October 2, 2025
London,UK
Solar Media Events
October 7, 2025
Manila, Philippines