Canadian Solar adds glass/glass 72-cell, 1500V ‘Diamond’ CS6X-P-FG PV module to product range

January 8, 2016
Facebook
Twitter
LinkedIn
Reddit
Email
Canadian Solar‘s Diamond CS6X-P-FG module is a 72-cell double-glass module.

Canadian Solar is introducing a 72-cell, 1500V ‘Diamond’ CS6X-P-FG PV module with heat-strengthened double glass configuration for commercial and utility-scale applications and is designed for high voltage systems of up to 1500 VDC, saving BOS costs.

Problem

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Providing high voltage PV modules up to 1500 VDC are claimed to lower BOS costs by reducing product count requirements. However, longevity needs to be met with glass/glass configurations and reductions in annual degradation levels.

Solution

Canadian Solar‘s Diamond CS6X-P-FG module is a 72-cell double-glass module. By replacing the traditional polymer backsheet with heat-strengthened glass, the Diamond module has a lower annual power degradation than a traditional module and better protection against the elements, making it more reliable and durable during its lifetime. The company said the module had a first year annual degradation of 2.5%, each subsequent year 0.5% and an 85.5% power output at year 25 and 83% power output at year 30. 

Applications

Commercial and utility-scale PV power plants.

Platform

Diamond CS6X-P-FG module is designed for high voltage systems of up to 1500 VDC, saving BOS costs. The module retains 5400 Pa snow load and 2400 Pa wind load due to strengthened frame. It also employs anti-PID cell and anti-PID encapsulation technology. The glass backside blocks moisture permeability and is said not to be affected by module-level corrosion.

Availability

September, 2015 onwards. 

Read Next

Premium
January 14, 2026
Analysis: As Eging PV comes under pressure to repay investment in an incomplete manufacturing facility, China’s solar manufacturers face an uphill struggle to put recent challenges behind them.
January 12, 2026
US metals firm Comstock has completed all the necessary permits to build a solar module recycling facility in Nevada.
December 31, 2025
Premier Energies and Waaree have both won module supply orders, while KP Group has signed a MoU with the Government of Botswana. 
December 29, 2025
Saatvik Green Energy has successfully commissioned and operationalised a 2GW EPE film manufacturing facility at its Ambala plant in Haryana.
December 23, 2025
Saatvik Green Energy, through its subsidiary Saatvik Solar Industries, has secured solar PV module orders worth INR4.8 billion (US$54.2 million).
Premium
December 18, 2025
PV Talk: Paul Gebhardt of Fraunhofer ISE discusses reliability issues facing advanced PV modules, an issue which isn't going anywhere.

Upcoming Events

Solar Media Events
February 3, 2026
London, UK
Solar Media Events
March 24, 2026
Dallas, Texas
Solar Media Events
April 15, 2026
Milan, Italy
Solar Media Events
June 16, 2026
Napa, USA
Solar Media Events
November 3, 2026
Málaga, Spain