Energy Innovations to install Sunflower system in Masdar City

Facebook
Twitter
LinkedIn
Reddit
Email

Energy Innovations announced that it has signed a contract to provide its Sunflower system for installation in Masdar City. The project, located near Abu Dhabi in the UAE, is touted to be the first carbon neutral, zero waste city powered entirely by renewable energy in the world. It is also the headquarters for the International Renewable Energy Agency (IRENA).

“It is quite appropriate that a forward-looking city like Masdar should choose to install CPV technology,” said Joe Budano, Energy Innovations’ CEO. “CPV brings great advantages over traditional PV and thin film and represents the future of solar in these high solar resource locations. We are proud to be chosen for this very important project and expect to demonstrate the value and robustness of our HCPV technology in this high radiation and high ambient temperature environment.”

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

Energy Innovation’s Sunflower technology is made to withstand high temperature conditions, the likes of which will be found at Masdar City. The Sunflower’s highly concentrated PV (HCPV) system uses triple junction cells, which are less affected by high ambient temperatures with a potential to lose only about 5% of their rated power.

Read Next

May 2, 2025
AEMO said that new renewable energy generation and energy storage projects in the final commissioning phase in the NEM have reached 7GW.
May 2, 2025
The Queensland government has announced plans to reform the approval process for solar PV and wind generation sites in the Australian state.
May 1, 2025
US utility Alliant Energy has opened a 200MW solar facility in Linn County, Iowa, called Pleasant Creek Solar.
May 1, 2025
US tracker manufacturer FTC Solar has announced a 57.6% quarter-on-quarter increase in revenue in the first quarter of this year.
May 1, 2025
Independent power producer (IPP) Arevon Energy has begun construction of its 430MW solar PV project in the US state of Missouri.
May 1, 2025
The ESMC has called for a restriction of remote access to PV inverters in Europe from ‘high-risk’ manufacturers, mainly those in China.

Subscribe to Newsletter

Upcoming Events

Media Partners, Solar Media Events
May 7, 2025
Munich, Germany
Solar Media Events
May 21, 2025
London, UK
Solar Media Events
June 17, 2025
Napa, USA
Solar Media Events
July 1, 2025
London, UK
Solar Media Events
July 1, 2025
London, UK