Energy Innovations to install Sunflower system in Masdar City

November 9, 2009
Facebook
Twitter
LinkedIn
Reddit
Email

Energy Innovations announced that it has signed a contract to provide its Sunflower system for installation in Masdar City. The project, located near Abu Dhabi in the UAE, is touted to be the first carbon neutral, zero waste city powered entirely by renewable energy in the world. It is also the headquarters for the International Renewable Energy Agency (IRENA).

“It is quite appropriate that a forward-looking city like Masdar should choose to install CPV technology,” said Joe Budano, Energy Innovations’ CEO. “CPV brings great advantages over traditional PV and thin film and represents the future of solar in these high solar resource locations. We are proud to be chosen for this very important project and expect to demonstrate the value and robustness of our HCPV technology in this high radiation and high ambient temperature environment.”

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Energy Innovation’s Sunflower technology is made to withstand high temperature conditions, the likes of which will be found at Masdar City. The Sunflower’s highly concentrated PV (HCPV) system uses triple junction cells, which are less affected by high ambient temperatures with a potential to lose only about 5% of their rated power.

Read Next

March 6, 2026
French energy major TotalEnergies has initiated pilot operations of the first generating unit at its 1GW solar farm in Iraq’s Basra region.
March 6, 2026
US solar manufacturer Silfab Solar has disputed some reports of chemical spillages at its manufacturing facility in Fort Mill, South Carolina.
March 6, 2026
Origis Energy has secured US$545 million in financing for three utility-scale solar projects with a combined capacity of 413MW in Texas.
March 6, 2026
Spanish independent power producer (IPP) Zelestra has begun the construction of 253MWdc Echols Grove and 188MWdc Cedar Range projects in Texas.
March 6, 2026
Silfab solar has paused operations at its module manufacturing plant in South Carolina following chemical spills.
March 6, 2026
Portland General Electric (PGE) has finalised agreements for more than 1,000MW of new renewable energy and battery energy storage system (BESS) projects in the US state of Oregon.

Upcoming Events

Solar Media Events
March 24, 2026
Dallas, Texas
Solar Media Events
April 15, 2026
Milan, Italy
Solar Media Events
June 16, 2026
Napa, USA
Solar Media Events
October 13, 2026
San Francisco Bay Area, USA
Solar Media Events
November 3, 2026
Málaga, Spain