First Solar’s factories roll on in US, Asia as COVID-19 lockdowns multiply

March 26, 2020
Facebook
Twitter
LinkedIn
Reddit
Email
Image credit: First Solar

First Solar has opted to keep its factories in US and Asia open for now following an assessment that some are not covered by lockdown plans enacted in either region.

On Thursday, the ‘Solar Module Super League’ (SMSL) member said the COVID-19 outbreak has so far not stopped its production lines at locations in the US state of Ohio, as well as the Southeast Asian countries of Malaysia and Vietnam.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The Nasdaq-listed firm said it is its “understanding” that its Ohio plants of Perrysburg and Lake Township can stay operational despite the ‘stay at home’ order issued by the US state on 22 March, forcing the confinement of citizens and the shutdown of non-essential businesses for two weeks.

First Solar has similarly concluded its Kulim manufacturing plants in Malaysia can remain in production even as anti-pandemic measures are rolled out in the Asian state, including movement restrictions set to last until at least 14 April.

Business as usual remains First Solar’s approach for the time being also in Vietnam’s Ho Chi Minh City. Its facilities in the city are “not impacted by government-mandated restrictions on movement at this time,” the SMSL member said.

Solar players scramble to interpret lockdown rules

First Solar’s interpretation that lockdown orders do not extend to solar factories mirrors similar views by others in the US. In the state of California, green energy operators examined state rules and concluded renewable installs and maintenance can be viewed as an “essential service”.

Elsewhere, renewable players in key markets from Spain to Australia have urged for the industry to be extended the same treatment, and exempted from business closures. This week, India acted to grant green energy staff the right to move and access plants despite the lockdown in place.

In Southeast Asia, solar manufacturers other than First Solar have sought to play down COVID-19’s impacts so far. Approached by PV Tech, Jetion Solar said last week its PV factory in Thailand has not been affected to date thanks to its sheltered location and the firm’s stocking-up efforts.

For Arizona-headquartered First Solar, the COVID-19 update follows its guidance last month of US$2.7-2.9 billion in sales for 2020 – down from the US$3.06 billion reported in 2019 – and forecasts of full-year shipments in the 5.8GW-6GW range.

The SMSL member said it will continue to monitor developments around all its facilities going forward. Describing staff safety as a “top priority”, the firm explained it has already enacted various measures to limit the spread of the COVID-19 virus across all of its locations worldwide.

PV Tech has also highlighted that LPKF Laser, a key equipment supplier to First Solar as it migrates and adds new Series 6 CdTe thin-film module capacity at all sites, is remaining fully operational at manufacturing sites in Germany that supply laser scribers to First Solar's continued capcity expansions in 2020.

PV Tech has set up a tracker to map out how the COVID-19 pandemic is disrupting solar supply chains worldwide. You can read the latest updates here.

If you have a COVID-19 statement to share or a story on how the pandemic is disrupting a solar business anywhere in the world, do get in touch at [email protected] or [email protected].

16 June 2026
Napa, USA
PV Tech has been running PV ModuleTech Conferences since 2017. PV ModuleTech USA, on 16-17 June 2026, will be our fifth PV ModulelTech conference dedicated to the U.S. utility scale solar sector. The event will gather the key stakeholders from solar developers, solar asset owners and investors, PV manufacturing, policy-making and and all interested downstream channels and third-party entities. The goal is simple: to map out the PV module supply channels to the U.S. out to 2027 and beyond.

Read Next

Premium
November 7, 2025
The increasing technical complexity of the renewable energy space has increased the demands on capital raising for those in the sector.
November 7, 2025
The US Geological Survey (USGS) has released the 2025 List of Critical Minerals, which includes silicon and tellurium.
November 7, 2025
Independent power producer (IPP) Matrix Renewables has completed the construction of a 284MW solar PV plant in Texas.
November 6, 2025
Inverter manufacturer SolarEdge sold close to 1.5GW of inverters in the third quarter of the year, driving revenue of US$340.2 million.
November 6, 2025
Osaka Gas and Sonnedix have announced plans to install a BESS at the latter's 38.7MW Oita solar project in Japan.
November 5, 2025
Voltec Solar has signed a supply deal to use solar cells produced by Toyo Solar in its solar modules produced in France.

Subscribe to Newsletter

Upcoming Events

Upcoming Webinars
November 12, 2025
10am PST / 1pm EST
Solar Media Events
November 25, 2025
Warsaw, Poland
Solar Media Events
December 2, 2025
Málaga, Spain
Solar Media Events
February 3, 2026
London, UK
Solar Media Events
March 24, 2026
Lisbon, Portugal