University-powering 255MW PV project nears completion in Australia

Facebook
Twitter
LinkedIn
Reddit
Email
The Sunraysia Solar Farm in the Riverina town of Balranald, near Mildura, will be comprised of 755,000 PV panels when completed and will be located over an 800-hectare site. Image: UNSW Sydney

With a new 255MW PV project nearing completion, the University of New South Wales (UNSW Sydney) is on pace to draw 100% of its energy usage from renewable sources by 2020. 

The Sunraysia Solar Farm in the Riverina town of Balranald, near Mildura, will be comprised of 755,000 PV panels when completed and will be located over an 800-hectare site.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Back in December 2017, UNSW Estate Management signed off on a 15-year solar supply deal with both Maoneng Australia and Origin Energy for 25% of the installation’s generation output, which would allow the university to reach its 100% goal by 2020. 

The plan is designed to address UNSW’s key environmental issues. The university will make the switch to 100% renewable electricity in December 2019, with UNSW Energy Manager Nicholas Jones noting that the Sunraysia Solar Farm is on track for completion by December 2019 as well. 

Jones added: “Excellent progress is being made with the construction of the solar farm and we are on target to achieve our ESP goal.”

All the earthworks, trenching and cable laying are complete at the site, while over 104,000 support piles have been driven in as well. Contractors are now more than half-way through installing the 755,000 solar panels on site as well. 

At peak output, the Sunraysia Solar Farm will generate enough energy to power more than 50,000 homes and will offset approximately 430,000 tonnes of carbon dioxide into the atmosphere annually. 

Read Next

August 21, 2026
SA Power Networks will run its annual test of the state's rooftop solar curtailment system on 25 August in South Australia.
August 21, 2026
Australia has extended a CGT concession for foreign investors in wind, solar and BESS by a further decade, pushing the deadline to June 2040.
August 20, 2026
AER found that rising solar and wind generation, supported by BESS, eased pressure across Australia's wholesale electricity market in 2025.
August 19, 2026
UNSW has achieved a 12.4% efficiency and record voltage for CZTS solar cells by reducing defects through improved copper-sulphur bonding.
August 18, 2026
The Australian and New South Wales (NSW) governments have jointly committed AU$2.5 billion (US$1.63 billion) to secure the future of the Tomago Aluminium smelter.
August 17, 2026
New South Wales (NSW) has released a Data Centre Policy Framework that ties streamlined planning approval for new data centres to commitments on renewable energy, water use and cost recovery, becoming the first state to translate Australia's national data centre policy direction into detailed operating rules.

Upcoming Events

Solar Media Events
October 13, 2026
San Francisco Bay Area, USA
Solar Media Events
November 3, 2026
Málaga, Spain
Solar Media Events
November 24, 2026
Warsaw, Poland
Solar Media Events
February 2, 2027
London, UK
Solar Media Events
April 20, 2027
Istanbul, Türkiye