California system operator CAISO wants to incentivise solar load shifting with energy storage

Facebook
Twitter
LinkedIn
Reddit
Email
A CAISO control centre in Folsom. Image: CAISO Facebook page.

Seeking ways to optimise the use of clean energy, California network operator CAISO (California Independent System Operator) is considering the introduction of a load-shifting product that would incentivise storing peak energy for later use.

As part of a drive to lower barriers and enhance the ability of distribution-connected energy resources and transmission grid-connected energy storage to participate in CAISO’s wholesale markets, CAISO is now on the third phase of ESDER (‘energy storage and distributed energy resources’). Phases one and two of ESDER have looked at topics like how to enable multiple uses of energy storage systems at grid-level.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

A document presented to the CAISO Board of Governors a week ago argues that at present, wasting energy is being incentivised, with wholesale payments offsetting the retail rate paid out. Conversely, a change to a load shifting product would mean using clean energy like that generated at rooftop PV plants at times when it can be most beneficial to the network, for example by reducing demand on the grid in the early evening when workers return to their homes and consume more energy – while PV plants have stopped producing power some hours before that.

CAISO said that three energy storage system and service providers, Tesla, Stem and Green Charge, have participated in meetings with the network operator’s staff to discuss what a load shift product could look like and what its technical specifications should be. Also at the table was the California Energy Storage Alliance (CESA) trade group.

The introduction of the product could have implications for retail rates paid for electricity – new time-of-use rates designed to capture the value of solar load shifting might be needed, for example, CAISO said.

The proposal for a behind-the-meter load shift product will now be considered over the next year as part of the wider ESDER3 phase. The network operator said it will find “gaps in tariff provisions and current resource modelling capabilities to enable load shift capability with the desired features”. CAISO said it would aim to introduce any new product developed in 2019.      

Read Next

November 18, 2026
Avantus has signed 20-year PPAs with utility Pacific Gas and Electric Company for a 800MW solar-plus-storage project in California.
November 16, 2026
US-based PV recycling company Solar Panel Recycling (SPR) has expanded its US footprint with a fifth recycling facility in Porterville, California.
November 12, 2026
Terra-Gen completes PV park in California, Duke Energy Florida plans four new solar arrays, and Altus Power acquires another 92 projects.
November 9, 2026
Sungrow has signed three distribution agreements in Australia covering 1.5GW of solar PV and 4GWh of battery storage, with Solar Juice, Supply Partners and Raystech Group.
October 19, 2026
JinkoSolar's Tiger Neo 5.0, an all-black residential PV module, is built on its TOPCon-based Amorphous-Si Passivating Cell (TAC) technology.
October 12, 2026
Australia's rooftop solar sector posted its strongest half-year performance since 2021, with battery storage increasingly riding alongside it.

Upcoming Events

Solar Media Events
November 24, 2026
Warsaw, Poland
Solar Media Events
February 2, 2027
London, UK
Solar Media Events
April 20, 2027
Istanbul, Türkiye