India details compulsory new solar component quality standards

Facebook
Twitter
LinkedIn
Reddit
Email
Manufacturers will have to apply to the Bureau of Indian Standards (BIS) to obtain registration. Credit: MNRE

India’s Ministry of New and Renewable Energy (MNRE) has issued a new order seeking to improve the quality of components in the solar sector.

The ‘Solar Photovoltaics, Systems, Devices and Components Goods (Requirements for Compulsory Registration) Order, 2017’ is due to come into force 12 months after it was published in the government’s official gazette.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Manufacturers will have to apply to the Bureau of Indian Standards (BIS) to obtain registration and be able to use a new Standard Mark. All goods sold, stored, imported, manufactured or distributed will have to conform to the new specified standard.

Otherwise, defective or non-compliant goods will be “deformed beyond use and disposed of as scrap”.

The ruling will apply to modules, inverters and energy storage batteries. Samples shall be taken at least once every two years for each product or series of products.

Former power minister Piyush Goyal had issued a warning about quality to the industry at Intersolar Europe back in June, however, analysts at Bridge to India had said that the new standards would not be any tighter than those of the IEC. The only real change would be the inspections on site within India and the mandate to obtain an India-approved certification.

India’s attempt to brush off its sometimes tarnished reputation for quality projects was discussed in the most recent edition of PV Tech Power.

Read Next

November 5, 2026
IB Solar has signed an MoU with three German companies to develop a 2GW TOPCon solar cell manufacturing line at its facility in India.
November 5, 2026
Essar Renewables has signed a PPA with NHPC Limited for a 300MW firm and dispatchable renewable energy (FDRE) project in Andhra Pradesh.
November 5, 2026
Tristan Erion-Lorico and Song Hao of Kiwa PVEL examine the negative consequences of overreliance on module nameplate power ratings for PV project economics.
November 3, 2026
Indian solar manufacturer Rayzon Solar has said its 5.1GW TOPCon solar cell manufacturing facility remains on schedule.
November 3, 2026
RenewSys India has signed a 1.2GW supply agreement with Kosol Energie for polyolefin elastomer (POE) encapsulants and backsheets.
November 2, 2026
Avaada Electro has secured ALMM enlistment for 7.1GW of n-type TOPCon solar cell manufacturing capacity from India's energy ministry.

Upcoming Events

Solar Media Events
November 24, 2026
Warsaw, Poland
Solar Media Events
February 2, 2027
London, UK
Solar Media Events
April 20, 2027
Istanbul, Türkiye