India releases draft regulation for testing solar equipment quality

August 24, 2016
Facebook
Twitter
LinkedIn
Reddit
Email
The MNRE is also working on a ‘Lab Policy’ for the renewable energy sector for testing, standardization and certification. Credit: ET Solar

India is seeking to ensure the quality and reliability of solar PV equipment imported into the country, as per a draft technical regulation released by the Ministry of New and Renewable Energy (MNRE).

The draft regulation relating to solar systems, devices and components introduces performance testing and standardisation.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The MNRE is also working on a ‘Lab Policy’ for the renewable energy sector for such testing, standardization and certification.

Under the proposals, in order to sell, import or store solar equipment, PV manufacturers will have to make an application to the Bureau of Indian Standards (BIS) to obtain registration for use of a “Standard Mark”, which is the BIS certification mark.

Authorities will also have the power to call for information from the manufacturers of solar products and samples of products will be drawn from randomly selected locations at least once every two years.

Manufacturers may then be issued “directions” on the back of the tests. Substandard or defective goods that are not compliant with standards will also be scrapped.

The draft was prepared following a consultation of the Bureau of Indian Standards. Comments on the proposals are sought by 6 September.

In May, members of India’s solar industry spoke out against alleged “unregulated” imports of Chinese solar and wind energy equipment to India.

Read Next

Premium
March 5, 2026
Analysis: Just as the energy crisis following Russia’s invasion of Ukraine led to a European pivot on clean energy, the US-Israel war on Iran presents another potential turning point, this time with a wider global reach.
March 4, 2026
ISC Konstanz has partnered with Celloraa Energy to develop a 1.2GW TOPCon cell production facility in Gujarat, India.
March 4, 2026
Group Surya has commissioned a G12R module manufacturing facility in Odisha, the first such manufacturing facility in the Indian state.
March 3, 2026
Average PV equipment costs for large-scale solar projects in India showed mixed trends in Q4 2025, said Mercom.
March 2, 2026
India is expected to add 42.5GW of new solar capacity in 2026, according to research analyst JMK Research’s Q4 2025 (Oct-Dec) India RE Update report. 
March 2, 2026
German wet processing equipment manufacturer RENA Technologies will supply its equipment to a planned 1.2GW TOPCon solar cell production facility in India.

Upcoming Events

Solar Media Events
March 24, 2026
Dallas, Texas
Solar Media Events
April 15, 2026
Milan, Italy
Solar Media Events
June 16, 2026
Napa, USA
Solar Media Events
October 13, 2026
San Francisco Bay Area, USA
Solar Media Events
November 3, 2026
Málaga, Spain