India releases draft regulation for testing solar equipment quality

August 24, 2016
Facebook
Twitter
LinkedIn
Reddit
Email
The MNRE is also working on a ‘Lab Policy’ for the renewable energy sector for testing, standardization and certification. Credit: ET Solar

India is seeking to ensure the quality and reliability of solar PV equipment imported into the country, as per a draft technical regulation released by the Ministry of New and Renewable Energy (MNRE).

The draft regulation relating to solar systems, devices and components introduces performance testing and standardisation.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The MNRE is also working on a ‘Lab Policy’ for the renewable energy sector for such testing, standardization and certification.

Under the proposals, in order to sell, import or store solar equipment, PV manufacturers will have to make an application to the Bureau of Indian Standards (BIS) to obtain registration for use of a “Standard Mark”, which is the BIS certification mark.

Authorities will also have the power to call for information from the manufacturers of solar products and samples of products will be drawn from randomly selected locations at least once every two years.

Manufacturers may then be issued “directions” on the back of the tests. Substandard or defective goods that are not compliant with standards will also be scrapped.

The draft was prepared following a consultation of the Bureau of Indian Standards. Comments on the proposals are sought by 6 September.

In May, members of India’s solar industry spoke out against alleged “unregulated” imports of Chinese solar and wind energy equipment to India.

Read Next

April 10, 2026
India has become the third-largest country by installed renewable energy capacity, reaching 274.68, with over 150GW of solar PV capacity, according to statistics from the Ministry of New and Renewable Energy (MNRE).
Premium
April 10, 2026
Despite PV’s maturity, a new paper argues that its growing global significance makes ongoing research essential.
April 8, 2026
PV manufacturing capital expenditure is expected to rebound this year, following two years in the doldrums as the industry weathered a global oversupply of modules, new figures show.
Premium
April 8, 2026
After a sharp decline in 2023, PV manufacturing capital expenditure is set to bounce back this year, and not just in China, writes Moustafa Ramadan.
April 7, 2026
Sangam Solar One, a subsidiary of Indian solar PV manufacturer Waaree Energies, has commissioned a 3GW PV module manufacturing facility in Samakhiali, Kutch, Gujarat.
April 7, 2026
According to Ember, solar-plus-storage could supply up to 90% of India’s electricity demand at a levelised cost of electricity (LCOE) of INR5.06/kWh (US$56/MWh).

Upcoming Events

Solar Media Events
April 15, 2026
Milan, Italy
Solar Media Events
June 16, 2026
Napa, USA
Solar Media Events
October 13, 2026
San Francisco Bay Area, USA
Solar Media Events
November 3, 2026
Málaga, Spain
Solar Media Events
November 24, 2026
Warsaw, Poland