Longi, Trina Solar and Tongwei team on 5GW mono ingot plant

Facebook
Twitter
LinkedIn
Reddit
Email
Longi Silicon Materials, Trina Solar and Tongwei, via its polysilicon subsidiary, Sichuan Yongxiang are to form a Joint Venture (JV) to own and operate a previously planned 5GW monocrystalline silicon ingot pulling production plant in Lijiang City, Yunnan Province, China by Longi. Image: Longi

Three major Chinese PV manufacturers, Longi Silicon Materials, Trina Solar and Tongwei, via its polysilicon subsidiary, Sichuan Yongxiang, are to form a Joint Venture (JV) to own and operate a previously planned 5GW monocrystalline silicon ingot pulling production plant in Lijiang City, Yunnan Province, China, by Longi. 

Longi said in financial filings that it would retain a 60% ownership in the planned production plant, while Trina Solar would hold a 25% interest and Sichuan Yongxiang a 15% stake. 

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Longi had previously announced plans for the 5GW monocrystalline silicon ingot plant in June, 2016 and had initially planned to fund the facility in-house. However, Longi noted that in a JV arrangement it was reducing financial and project risks. 

The company has a range of other dedicated in-house capacity expansions for monocrystalline wafer, cell and modules. 

Silicon Module Super League (SMSL) member Trina Solar is expected to contribute an initial RMB 200 million (US$28.8 million) to the project and Sichuan Yongxiang around RMB 120 million (US$17.3 million). 

Longi still expects to contribute an initial RMB 480 million (US$69 million) to the project, which is expected to incur capital costs of around RMB 800 million (US$115 million). The plant is expected to take more than a year to build and start ramping sometime in 2018. 

According to Finlay Colville, Head of Market Research at Solar Media Ltd, in a new blog on the news, the JV in not unexpected as it forms part of one of the most pro-active technology drives seen for many years within the industry.

Read Next

November 18, 2026
Chinese authorities have set 2030 as the target date for establishing a more coherent system to manage the country’s growing volumes of PV waste.
November 17, 2026
Quality defects the solar industry resolved more than a decade ago are resurfacing as PV manufacturing geographies shift, according to Cherif Kedir, CEO of the Renewable Energy Test Center (RETC).
Premium
November 17, 2026
Cherif Kedir, CEO of the Renewable Energy Test Center, discusses how a new generation of PV module manufacturers is making basic production errors the industry solved over a decade ago.
November 17, 2026
The latest edition of PV Tech Power leads with a special report that takes you behind the scenes of America’s burgeoning PV manufacturing sector.
November 17, 2026
Chinese PV manufacturer Trina Solar is among four new shareholders €15 million in the French start-up HoloSolis planned 5GW module plant.
November 13, 2026
Rezolv Energy has announced its partners for the construction of Dama Solar, its 1.36GWp solar PV project in Arad County, western Romania.

Upcoming Events

Solar Media Events
November 24, 2026
Warsaw, Poland
Solar Media Events
February 2, 2027
London, UK
Solar Media Events
April 20, 2027
Istanbul, Türkiye