RES’ proposed 285MW of solar-plus-storage in New South Wales open for public comment

Facebook
Twitter
LinkedIn
Reddit
Email

Applications made to the government of New South Wales in Australia for two solar farms totalling 285MW of capacity are open to comment from stakeholders and members of the public.

Tarleigh Park Solar Farm would be a 90MW utility-scale solar PV park, the development of which is currently being investigated by UK-headquartered developer RES (Renewable Energy Systems), in Blighty, a small development 23km southeast of the nearest ‘big’ town, Delinquin (population: around 8,000).

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

About 2km away would be Currawarra Solar Farm, a 195MW facility, for which RES has also made an application. In both instances, RES said it has performed “a comprehensive suite of environmental surveys” and the viability of both projects is being assessed through “extensive community consultation”. Both projects' proposals include battery energy storage.

To read the full version of this story, visit Energy-Storage.News.

Utility-scale solar farm under construction in the US by RES. Image: RES Americas Facebook page.

Read Next

Subscribe to Newsletter

Upcoming Events

Solar Media Events
April 10, 2024
Dallas, Texas USA
Solar Media Events
April 17, 2024
Lisbon, Portugal
Solar Media Events
May 1, 2024
Dallas, Texas
Solar Media Events
May 21, 2024
Napa, USA