Saudi Arabia reignites plans for integrated solar manufacturing

Facebook
Twitter
LinkedIn
Reddit
Email
South Korea’s OCI is a major polysilicon producer, while LONGi Green Energy Technology is a largest dedicated monocrystalline wafer producer and its subsidiary, LONGi Solar is a ‘Silicon Module Super League’ (SMSL) member. Image: LONGi Solar

According to reports, Saudi Arabia’s National Industrial Clusters Development Program (NICDP) and petrochemicals to manufacturing conglomerate SABIC have signed MOU’s with LONGi Group and OCI to bring fully integrated solar manufacturing to the country. 

Tariq Bakhsh, vice president of the chemicals and renewables program at NICDP was reported to have said that the signed MOU’s included a feasibility study that was expected to take around six months to complete.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

LONGi Group has confirmed the MOU signing to PV Tech. 

South Korea’s OCI is a major polysilicon producer, while LONGi Green Energy Technology is a largest dedicated monocrystalline wafer producer and its subsidiary, LONGi Solar is a ‘Silicon Module Super League’ (SMSL) member. 

Plans for establishing a major PV manufacturing hub in Saudi Arabia are not new but previous plans never materialised. 

NICDP was reported to have said that it may be ready to provide further details of the potential partnerships by the end of 2019. 

Read Next

November 20, 2026
US PV module prices have surged ahead of the Section 232 polysilicon measures taking effect on 4 December, according to new Anza data.
November 18, 2026
The number of defects related to so-called creepage distance has increased significantly in recent years following the introduction of M10R solar cells, according to Kiwa PI Berlin.
November 18, 2026
Chinese authorities have set 2030 as the target date for establishing a more coherent system to manage the country’s growing volumes of PV waste.
November 17, 2026
Quality defects the solar industry resolved more than a decade ago are resurfacing as PV manufacturing geographies shift, according to Cherif Kedir, CEO of the Renewable Energy Test Center (RETC).
Premium
November 17, 2026
Cherif Kedir, CEO of the Renewable Energy Test Center, discusses how a new generation of PV module manufacturers is making basic production errors the industry solved over a decade ago.
November 17, 2026
The latest edition of PV Tech Power leads with a special report that takes you behind the scenes of America’s burgeoning PV manufacturing sector.

Upcoming Events

Solar Media Events
November 24, 2026
Warsaw, Poland
Solar Media Events
February 2, 2027
London, UK
Solar Media Events
April 20, 2027
Istanbul, Türkiye