Tesla plans US$10.1 billion vertically integrated solar cell plant in Texas

Facebook
Twitter
LinkedIn
Reddit
Email
Tesla Gigafactory, Nevada. The company’s proposed facility in Texas represents the biggest single-site investment in US solar manufacturing, according to PV Tech Research. Image: Tesla

US EV, battery, AI and robotics company Tesla has submitted plans for a US$10.1 billion vertically integrated solar manufacturing campus in Fort Bend County, Texas, according to application documents filed with the Texas Comptroller.

The proposed ‘Project Crystal Sun’ would be built on a 3,050-acre site near Richmond and represents the largest single manufacturing investment Tesla has proposed to date, if approved and developed as planned.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The investment comprises US$1.5 billion in real property and US$8.6 billion in manufacturing equipment and other personal property. However, the Chapter 312 tax application does not disclose an annual nameplate manufacturing capacity for the facility.

The filing outlines a fully integrated solar manufacturing operation spanning the silicon-to-module value chain. Equipment included in the application covers ingot manufacturing, wafer slicing, chemical coating, metallisation and printing, cell testing and quality control, as well as automated material handling and cleanroom systems.

The scale of the equipment investment will support high-volume automated wafer and cell manufacturing rather than a downstream module assembly facility alone. The proposed campus would also include chemical storage and delivery systems, utility infrastructure and environmental and safety systems.

Commenting on the investment, Joe Hennessy, market research analyst at PV Tech Research, said, “This is a massive investment in US manufacturing, as big as we’ve ever seen for one site. Qcells’s facility at Cartersville cost around US$2.5 billion for 3.3GW of integrated PERC capacity, suggesting this facility could have a capacity of more than 10GW on a single site.”

Tesla is seeking a 10-year property tax limitation under the Texas Jobs, Energy, Technology and Innovation Act to support the development. The project is expected to create 9,712 permanent full-time jobs once fully operational, alongside 1,147 local construction jobs.

Construction is targeted to run from 2026 through 2028, with commercial production scheduled to begin in the first quarter of 2029.

Hennessy added: “This year, many suppliers have aimed for vertical integration in the US. This is due to the many barriers imports must go through the antidumping and countervailing duty (AD/CVD) and the new Section 232 regulations, starting in December. This will likely start a trend of even more upstream investment, now that those have been announced.”

US solar manufacturers are facing an increasingly complex trade environment, with the US Department of Commerce (DoC) pursuing AD/CVD cases covering imports from India, Indonesia and Laos. US manufacturers have also asked the DoC to investigate alleged circumvention involving Ethiopian solar cells produced by Toyo Solar and Origin Solar using Chinese-origin components, as well as imports of solar cells from South Korea involving Hanwha and other producers.

Furthermore, last week, US President Donald Trump introduced a 15% tariff on imports of products using polysilicon and set minimum prices for polysilicon and its derivatives under Section 232 of the Trade Expansion Act of 1962. The measures are due to take effect on 4 December 2026. Moustafa Ramadan, head of market research at PV Tech Research, described the move as “one of the biggest events in the US solar landscape.”

For insight into the leading PV module suppliers serving the global utility-scale market, see the PV ModuleTech Bankability Ratings Quarterly report from the PV Tech Research team.

The state of the US solar supply chain will be explored in detail at our annual PV CellTech USA conference in San Francisco on 13-14 October 2026. For full agenda and booking details, click the link above.

13 October 2026
San Francisco Bay Area, USA
PV Tech has been running an annual PV CellTech Conference since 2016. PV CellTech USA, on 13-14 October 2026 is our fourth PV CellTech conference dedicated to solar manufacturing in the USA. From polysilicon, wafers, ingots, cells and modules, to critical component suppliers including glass and frames, the event connects every stage of the value chain under one roof. PV CellTech USA also brings together investors, innovators, manufacturers and industry stakeholders to collaborate and strengthen domestic solar manufacturing across the United States.

Read Next

Premium
September 7, 2026
Australia's National Electricity Market (NEM) recorded a combined 3,893GWh of solar generation in August 2026, comprising 1,628GWh from utility-scale assets and 2,265GWh from rooftop systems.
September 4, 2026
Inox Solar Americas has signed a 767MW module supply agreement with a US renewable energy developer and independent power producer.
September 4, 2026
Germany and the wider EU can use its research and development strengths to stay competitive in the global solar PV manufacturing industry, according to a group of industry and research bodies.
September 4, 2026
PV deployment in Africa is booming, but not showing up in official statistics, new analysis by Ember and African Tech Futures Lab reveals
September 4, 2026
India's CEA has proposed mandatory grid-forming inverters and co-located energy storage for new renewable energy projects from July 2027.
September 4, 2026
News of two utility-scale solar PV developments in Texas, where construction began on a 347MW project in Wharton County and finances secured for a 310MW/250MWh pair of projects.

Upcoming Events

Solar Media Events
October 13, 2026
San Francisco Bay Area, USA
Solar Media Events
November 3, 2026
Málaga, Spain
Solar Media Events
November 24, 2026
Warsaw, Poland
Solar Media Events
February 2, 2027
London, UK