US begins WRO enforcement in earnest with solar modules detained by customs officials, say reports

Facebook
Twitter
LinkedIn
Reddit
Email
US Customs and Border Protection is alleged to have seized module shipments from numerous manufacturers. Image: Pixabay.

Reports have emerged alleging that US officials have begun detaining solar module shipments suspected of infringing the withhold and release order (WRO) implemented in June.

The WRO, which effectively blocks the import of silicon metal from Hoshine Silicon Industry and its subsidiaries, as well as solar products suspected of containing silicon products manufactured by Hoshine, is enforced by US Customs and Border Protection.

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

Yesterday ROTH Capital reported that some manufacturers – namely JinkoSolar, Canadian Solar and Trina Solar – have had modules detained in recent weeks. While Canadian Solar and Trina Solar are alleged to have had sample modules detained, JinkoSolar is reported to have had upwards of 100MW of solar module shipments held by customs officials. Credit Suisse has also reported that JinkoSolar has been beset by module detainments.

JinkoSolar declined to comment when contacted by PV Tech, while Canadian Solar and Trina Solar have yet to respond to requests for comment at the time of publication.

The US Department of Commerce and US Customs and Border Protection had also yet to respond to requests for comment by PV Tech.

During a conference call with analysts held after its Q2 results disclosure last week, Yan Zhuang, president of Canadian Solar’s manufacturing arm, said the company had been working hard to deal with the prospect of the WRO and insisted Canadian Solar was “pretty confident that we can overcome that constraint”.

Shares in both JinkoSolar and Canadian Solar fell by around 6% yesterday.

As detailed by PV Tech Premium in June, in the event of shipments being detained the importer has three months to either submit documentation proving the WRO does not apply to its products or arrange for them to be re-exported. After those three months, if products are still under question the importer has 60 days to arrange for their re-export, and if products remain at the port of entry after that period they are deemed abandoned and destroyed.

The news of WRO enforcement comes amidst a flurry of activity pertaining to trade relations between the US and China, with solar PV finding itself the subject of much attention. Yesterday also saw petitions filed on behalf of an alliance of US solar manufacturers alleging Chinese solar companies were circumventing antidumping and countervailing duties through the use of entities based in Malaysia, Vietnam and Thailand, with the express likelihood that petitions filed with the US Department of Commerce could result in such duties being extended to include Southeast Asian nations.

Meanwhile an amendment to the budget reconciliation bill currently passing through the US Senate tabled by Republican senator Dan Sullivan which seeks to ban renewables projects using technology developed in China from claiming federal funds and subsidies received considerable support from the Senate, however the overall bill remains some way from passing into law.  

17 June 2025
Napa, USA
PV Tech has been running PV ModuleTech Conferences since 2017. PV ModuleTech USA, on 17-18 June 2025, will be our fourth PV ModulelTech conference dedicated to the U.S. utility scale solar sector. The event will gather the key stakeholders from solar developers, solar asset owners and investors, PV manufacturing, policy-making and and all interested downstream channels and third-party entities. The goal is simple: to map out the PV module supply channels to the U.S. out to 2026 and beyond.
7 October 2025
San Francisco Bay Area, USA
PV Tech has been running an annual PV CellTech Conference since 2016. PV CellTech USA, on 7-8 October 2025 is our third PV CellTech conference dedicated to the U.S. manufacturing sector. The events in 2023 and 2024 were a sell out success and 2025 will once again gather the key stakeholders from PV manufacturing, equipment/materials, policy-making and strategy, capital equipment investment and all interested downstream channels and third-party entities. The goal is simple: to map out PV manufacturing in the U.S. out to 2030 and beyond.
21 October 2025
New York, USA
Returning for its 12th edition, Solar and Storage Finance USA Summit remains the annual event where decision-makers at the forefront of solar and storage projects across the United States and capital converge. Featuring the most active solar and storage transactors, join us for a packed two-days of deal-making, learning and networking.
10 March 2026
Frankfurt, Germany
The conference will gather the key stakeholders from PV manufacturing, equipment/materials, policy-making and strategy, capital equipment investment and all interested downstream channels and third-party entities. The goal is simple: to map out PV manufacturing out to 2030 and beyond.

Read Next

March 20, 2025
Located in the southern state of Mississippi, the Wildflower Solar project is the first investment in the state from the developer.
March 20, 2025
Through its US subsidiary, Mission Solar Energy, the Korean company will invest US$265 million in the construction of the plant.
March 20, 2025
Uncertainty over tax credits could cause 84% of investors and 73% of developers to decrease their activity in renewable energy, according to ACORE.
March 19, 2025
The US$334 million will support the construction of the 200MW Branch and the 50MW Genesee Solar projects in Michigan.
March 19, 2025
US community solar project developer Dimension Energy has upsized its corporate credit facility from US$150 million to US$300 million.
March 19, 2025
Meta has signed offtake deals for various utility-scale PV projects, many of which are in Texas, where it has relocated some operations.

Subscribe to Newsletter

Upcoming Events

Solar Media Events
March 25, 2025
Lisbon, Portugal
Solar Media Events
March 26, 2025
Renaissance Dallas Addison Hotel, Dallas, Texas
Media Partners, Solar Media Events
April 23, 2025
Fortaleza, Brazil
Solar Media Events
April 29, 2025
Dallas, Texas
Media Partners, Solar Media Events
May 7, 2025
Munich, Germany