Azure Power commissions 150MW solar project in Rajasthan

Facebook
Twitter
LinkedIn
Reddit
Email
Credit: Azure Power

Indian developer Azure Power has commissioned a 150MW PV plant at Bhadla solar park in the northwest Indian state of Rajasthan. 

This is the first 150MW of 200MW awarded to Azure by Solar Energy Corporation of India (SECI), with a tariff of INR2.48 (~US 3.6 cents) per kWh for 25 years.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The plant brings Azure's tally to 1.6GW of operational solar assets, spread across 24 states, including a rooftop portfolio of over 200MW.

Inderpreet Wadhwa, founder, chairman and CEO, Azure Power, said: “With this commissioning, we have one of the highest rated and diverse solar portfolios in India. This is a direct result of our strong project development, engineering, and execution capabilities. We are delighted to make this contribution towards the realization of our Hon'ble Prime Minister's commitment towards clean and green energy through solar power generation.”

22 October 2026
India Expo Mart, Greater Noida
Whether you're looking for new technologies, trusted partners, or fresh business opportunities, you'll find them at the 19th Renewable Energy India Expo 2026. Join 55,000+ industry professionals and 1,000+ exhibiting brands across 14 halls featuring solar, bioenergy, battery storage, and the Germany Pavilion. It's where the clean energy sector comes together to exchange ideas, build partnerships, and drive business forward.

Read Next

Premium
September 4, 2026
India’s Energy Stack aims to strengthen digital infrastructure, enabling India to manage a decentralised electricity system amid rapid renewable growth.
September 4, 2026
India's CEA has proposed mandatory grid-forming inverters and co-located energy storage for new renewable energy projects from July 2027.
September 2, 2026
Waaree Energies approved US$37 million to expand its Arizona module plant to 1.6GW and consolidate 2.11GW in Gujarat.
September 2, 2026
India’s solar module capacity has reached 233GW, with factories operating at 35–40% utilisation amid rising overcapacity.
August 26, 2026
India’s renewable capacity reached 288GW by June 30, 2026, accounting for 54% of total installed capacity, JMK reported.
August 24, 2026
MNRE's ninth ALMM-II revision adds larger-format G12R N-type TOPCon cells from Emmvee, Waaree, Avaada and several others.

Upcoming Events

Solar Media Events
October 13, 2026
San Francisco Bay Area, USA
Solar Media Events
November 3, 2026
Málaga, Spain
Solar Media Events
November 24, 2026
Warsaw, Poland
Solar Media Events
February 2, 2027
London, UK