Cleaning-robots can cause long-term module damage, finds PI Berlin

Facebook
Twitter
LinkedIn
Reddit
Email
Dust on modules can cause a 100% loss of yield. Image: PI Berlin.

Dust and sand on PV arrays in the desert can have a negative impact on module performance, but so too can the automated solutions available to clean them.

That is the conclusion of work undertaken by German testing house, PI Berlin, which has developed a number of stress tests to assess the impact of systems developed to remove the sand or fine dust that inevitably settles on modules in desert locations.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

According to PI Berlin, a sandstorm can lead to a 100% loss in yield from a desert array, while even partial coverage with dust or sand can lead to large output reductions. Other consequences of soiling include hotspots from temperature increases in non-soiled parts of a module, which can lead to deterioration such as backsheet burn-through.

Partial soiling of modules can create dangerous hotspots. Image: PI Berlin.

To minimise the effects of soiling, a growing number of cleaning solutions are finding their way on to the market, but even these are not without their drawbacks, PI Berlin has found.

“PV cleaning robots are increasingly being used in desert regions. This is why module manufacturers responding to calls for tender have recently started to be required to present confirmation from an independent testing institute that the surface of their solar modules is resistant to cleaning,” said Dr Juliane Berghold, head of module technology and research at PI Berlin.

“A variety of cleaning solutions are available on the market, ranging from robots that clean the modules with water to dry-cleaning systems that use air pressure or brushes. We simulate various cleaning methods on purpose-built test configurations as closely as possible to how they are performed in practice. These tests very often reveal, for example, that over time cleaning damages the antireflection coating used on solar modules, especially if the modules were not coated using a vacuum deposition process. In some cases, however, even the entire glass surface becomes scratched.” 

A series of articles exploring PV in harsh environments, including deserts, will feature in the next issue of PV Tech Power. PI Berlin is contributing a piece on its testing of module-cleaning regimes, while a team of German and Chilean scientists give an account of the development of a module designed to withstand harsh desert conditions. PV Tech Power will be available in print and digitally from Monday 14 December. To subscribe, click here.

1 September 2026
Dubai World Trade Centre, UAE
Intersolar Middle East and Middle East Energy are coming together to present the mega energy event for the MENA region. From April 7–9, 2026, Dubai World Trade Centre will host Intersolar Middle East Exhibition and Conference alongside the 50th Middle East Energy. Intersolar Middle East focusses on the areas of photovoltaics, PV production technologies, and energy storage systems. The combined event expects to attract more than 45,000 trade visitors from around the world and feature 1,900+ exhibitors.

Read Next

May 28, 2026
Research from Solargis suggests current industry practice for calculating impacts of degradation on inverters may be wrong by more than 3%.
Sponsored
May 27, 2026
From next-generation modules to bifacial innovations, Tongwei's booth A2.350 promises to be a destination for anyone serious about solar.
May 19, 2026
Toyo Solar has posted a 177% increase in revenues in Q1 2026, after bringing online new cell and module manufacturing facilities.
May 18, 2026
Naqaa Sustainable Energy has signed a power purchase agreement (PPA) for a 2.7GW hybrid renewable energy project in Mahout and Duqm, Oman.
May 14, 2026
Kiwa PVEL has rolled out updates to its module testing programme, with two changes affecting Static Mechanical Load (SML) and hail testing.
May 5, 2026
Masdar has signed an agreement with Emirates Water and Electricity Company (EWEC) to accelerate the deployment of more than 30GW of solar PV capacity and over 8GW of battery storage in the UAE. 

Upcoming Events

Media Partners, Solar Media Events
June 2, 2026
Johannesburg, South Africa
Media Partners, Solar Media Events
June 3, 2026
National Exhibition and Convention Center (Shanghai)
Solar Media Events
June 16, 2026
Napa, USA
Media Partners, Solar Media Events
June 30, 2026
Sacramento, California
Media Partners, Solar Media Events
August 25, 2026
São Paulo, Brazil