LONGi calls for industry alignment on wafer size as Hi-MO4 sales top 2GW

August 21, 2019
Facebook
Twitter
LinkedIn
Reddit
Email
The Hi-MO4 launch at Intersolar Europe 2019.

The solar industry must work together to agree on standardised larger wafer sizes, according to monocrystalline solar manufacturer LONGi Group.

The company has revealed that its H-MO4 module, which utilises M6 (166mm) wafers, has now sold 2GW. PV Tech understands European availability is expected in Q4 2019.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The firm is now backing that wafer size with a series of upgrades across its own facilities.

“By end 2020, LONGi will upgrade its existing cell and module lines and transform them for production with the 166mm wafer,” said Wang Yingge, executive assistant to the chairman of LONGi Solar. “New lines such as the 5GW monocrystalline cell line in Yinchuan will be designed for the 166mm size from the start,” said Yingge adding that large-scale production of Hi-MO4 will commence the third quarter of 2019.

Larger wafers create more efficient modules but also mean more weight and greater physical stresses. Production equipment must also be amended. According to LONGi, the divergence in larger wafer sizes began in 2018 and is leading to a number of mismatches along the supply chain.

“The 166mm wafer has reached the allowable limit of production equipment which is difficult to overcome. This would be the upper limit of the standard for a considerable period,” said Professor Shen Wenzhong, Director, Solar Energy Research Institute of Shanghai Jiaotong University.

“If manufacturers cannot reach an agreement on a size standard, it will restrict the development of the whole industry,” said Li Zhenguo, president of the LONGi Group. 

Shen Wenzhong added: “Existing crystal drawing and slicing equipment are compatible with 166mm size silicon wafer. Production equipment for cell and module needs to be modified, though the costs are lower and easier to achieve. Calculated by “flux”, cell and module production lines using 166mm wafers will increase capacity by 13% as compared with the 156mm size.”

At present, M6 wafer have a price premium of RMB0.4 (US$0.057) compared to the M2 wafer but as scale increases beyond 2019, Yingge said this premium is set to halve.

Read Next

Sponsored
December 4, 2025
LONGi  unveiled its energy storage strategy in London last week, officially announcing its entry into the storage sector with the launch of the LONGi Energy Storage One-Stop Solution.
December 2, 2025
Astronergy and JA Solar have 'reached an agreement on cross-licencing' of tunnel oxide passivated contact (TOPCon) patents moving forward.
December 1, 2025
Multinational solar manufacturer Canadian Solar will assume direct control of its US solar PV and energy storage manufacturing operations, in a strategic move which may reduce its supply chain risks.
Premium
December 1, 2025
Steven Xuereb of Kiwa PI Berlin discusses the PV industry’s progress in addressing performance and reliability concerns around TOPCon technology.
November 28, 2025
The European Patent Office (EPO) has revoked a patent for a key solar cell manufacturing process, which has been hailed as “good news” for European solar PV manufacturing.
November 28, 2025
LONGi has acquired system integrator PotisEdge, and plans to launch an ‘Energy Storage One-Stop Solution’.

Upcoming Events

Upcoming Webinars
December 17, 2025
2pm GMT / 3pm CET
Solar Media Events
February 3, 2026
London, UK
Solar Media Events
March 24, 2026
Dallas, Texas
Solar Media Events
April 15, 2026
Milan, Italy
Solar Media Events
June 16, 2026
Napa, USA