Solarpack wins 21-year PPA for 116MW plant in Malaysia

January 2, 2020
Facebook
Twitter
LinkedIn
Reddit
Email
Source: Solarpack

Solarpack has bagged a 21-year power purchase agreement (PPA) through a competitive tender for a 116MW PV park in northern Malaysia.

The deal sets the price of electricity at MYR231.8 (US$56.7)/MWh, assuring energy sales of more than MYR800 million (US$186 million) over the contract’s lifetime.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

It was awarded to the Spanish solar developer in a tender launched by Malaysia’s energy commission in February 2019.

The commission published a list of the tender’s five winners – picked from a pool of 112 bids – in December.

The Suria Sunghai Petani solar park must be commissioned before 31 December 2021 in order to meet the conditions of the tender.

The grid-connected facility will produce 180GWh annually to Malaysian utility Tenaga National Berhad.

The project is in the province of Kedah in northwest Malaysia.

With this new project, the company now has a 215MW project backlog in 2019, by its own estimations.

Solarpack, which has operational PV projects in Spain, Chile, Peru, Uruguay and India, revealed a slide in net profits and a major boost in turnover in its Q3 2019 results. Revenues were €38.1 million (US$42 million) for the January to September 2019 period, an 83% jump on the €20.8 million (US$22.93 million) recorded in the same period in 2018.

Read Next

March 24, 2026
Sunraycer has signed long-term power purchase agreements with Google for its Lupinus and Lupinus 2 solar projects in Texas.
March 20, 2026
Danantara, has secured US$1.4 billion to back the government’s push for 50GW of new renewable energy capacity by 2035, with a focus on solar.
March 18, 2026
Origis Energy has commenced operations at its 210MWdc Wheatland utility-scale solar project in Knox County, Indiana.
March 4, 2026
PPA prices are set to continue to rise in the short-term, “as demand outpaces supply”, accotding to Geoffrey Lehv of kWh Analytics.
February 12, 2026
Developer EDRA Global Energy, a subsidiary of CGN, has started construction on a 300MW floating PV (FPV) project in Malaysia.
February 2, 2026
The price of solar PPAs signed in North America increased 3.2% between the third and fourth quarters of 2025, reaching a high of US$61.67/MWh.

Upcoming Events

Solar Media Events
April 15, 2026
Milan, Italy
Solar Media Events
June 16, 2026
Napa, USA
Solar Media Events
October 13, 2026
San Francisco Bay Area, USA
Solar Media Events
November 3, 2026
Málaga, Spain
Solar Media Events
November 24, 2026
Warsaw, Poland