Distributed generation connections in Brazil, which are dominated by solar technology, grew 308% in 2015, according to new figures released by Brazil’s energy regulator the National Electric Energy Agency (ANEEL).
2015 was a landmark year for the Indian solar industry, with the 100GW by 2022 target approved and a significant ramp up of deployment. Bridge to India's Jyoti Gulia discusses the challenges ahead regarding project delays, transmission infrastructure and financing.
Developers in India have failed to install 680MW of solar PV projects that were due to be commissioned by December 2015 because of project delays, according to consultancy firm Bridge to India.
Multinational developers are winning solar projects in India by bidding at extremely low tariffs to make a beginning in the Indian market, but with little appetite to bid at the same low levels again, according to a prominent industry figure.
Indian conglomerate Adani Group and solar developer Azure Power have both been awarded 50MW of capacity with winning bids of INR 4.78/kWh (US$0.07) in the 100MW solar auction in the Indian state of Uttar Pradesh.
Two Spanish parties have presented non-legislative proposals to repeal some of the most harming aspects of the Royal Decree against self-consumption of solar energy in Spain.
A consortium of Spain-based solar firm Solarpack and US company Think Energy Partners will build six PV projects totalling 100MW capacity in the Indian state of Telangana.