First Solar ends heterojunction foray; shifts Malaysian plant to CdTe Series 5 assembly

Facebook
Twitter
LinkedIn
Reddit
Email
First Solar said that the TetraSun production plant in Malaysia would be converted and dedicated to its CdTe thin-film Series 5 module assembly requirements and be operational in early 2017.

Updated: Leading CdTe thin-film manufacturer First Solar is discontinuing development and production of its hybrid heterojunction silicon cell and module technology, acquired via the acquisition of start-up TetraSun.

First Solar said that the TetraSun production plant in Malaysia would be converted and dedicated to its CdTe thin-film Series 5 module assembly requirements and be operational in early 2017.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The discontinuation of its TetraSun operations would result in impairment charges of approximately US$90 million to US$110 million. 

Finlay Colville, head of market intelligence at Solar Media, told PV Tech that rumours had recently surfaced that the TetraSun operations were up for sale again.

“The precise reasons may never be known for why First Solar closed its TetraSun activities, and there are likely a combination of factors, not simply technology milestones for pilot line metrics, noted Colville. “In some respects, it may have been overly-ambitious for First Solar to have elevated c-Si activities so much when TetraSun was acquired. At the time, the acquisition was cited by the company as being the route to getting traction in the Japanese rooftop market, but no doubt the lure of residential market-share in the US would have been running a close second then.”

“Had the activities at TetraSun remained stealth, as they were when First Solar was undertaking its stealthlike CIGS research in the US, then no-one would have been expecting updates; nor would there have been any post-mortem once the company announced out of the blue that the Malaysian operations had ceased,” add Colville.

First Solar said it expected its operating expenses would be educed by US$2 million to US$4 million in 2016 and US$8 million to US$10 million annually going forward. 

“Over the past two years, execution of our CdTe technology roadmap has positioned the product as the industry leader for utility-scale solar, as well as established a promising path into the future. The Series 5 module, and the Series 6 module still in concept development, are game-changing products that position us for exciting growth. They require the full attention of our manufacturing operations,” said de Jong. 

“TetraSun is a sound technology for space constrained rooftops, and served largely as a hedge against CdTe technology competitiveness that had challenged us in the past,” he added. “With the success of our CdTe roadmap reflected in our record 22.1% cell efficiency, along with the proven higher energy yield and superior performance inherent in our thin film technology, that hedge is no longer needed.” 

First Solar noted that almost all of the Kulim production associates that had been assigned to the TetraSun production line would move over to the Series 5 assembly line.

According to Colville the challenges of brining heterojunction technology to volume production at competitive costs should not be underestimated.

“Whether anyone was holding their breath on TetraSun being anything other than a wildcard play by First Solar is also open to question,” noted Colville. “In this respect, perhaps the most telling obituary on TetraSun's efforts to create a high-efficiency technology to compete with SunPower will be the one that compares the rise and fall of TetraSun to the pending make-of-break year for SolarCity as they seek to build their GW fab in Buffalo using Silevo's c-Si technology.”

“If anyone needed a firm reminder that moving advanced cell architectures from concept to reality is a massive challenge, then First Solar's exit from TetraSun operations provides this in droves. For the highest R&D and capex spender in solar manufacturing to walk away from c-Si efforts is significant, and perhaps all the more prudent compared to setting up a GW-scale factory and trying to convince the rest of the world that everything will be all right on the night. For this, First Solar deserves credit,” concluded Colville. 

Read Next

May 11, 2026
Chinese solar manufacturing major Trinasolar has received supply chain traceability certifications from the Solar Stewardship Initiative (SSI) for two of its manufacturing facilities in China.
May 11, 2026
Chinese solar manufacturing giant JinkoSolar has sold a majority stake in its US business to private equity firm FH Capital.
April 22, 2026
Chinese PV manufacturer Aiko has issued two major announcements regarding its plans to accelerate production of its high-efficiency all-back-contact (ABC) technology.
April 20, 2026
Chinese PV manufacturer JinkoSolar has launched a new lightweight solar module designed for low-load-bearing rooftops.
April 16, 2026
JinkoSolar’s 2025 results have revealed declines in annual module shipments and revenues, as well as a sharp drop in profitability.
April 15, 2026
Rumours of a closed-door meeting in China to discuss polysilicon production cuts sent the share prices of several leading players higher before they were widely denied.

Upcoming Events

Solar Media Events
May 20, 2026
Porto, Portugal
Upcoming Webinars
May 27, 2026
9am BST / 10am CEST
Upcoming Webinars
May 27, 2026
9am BST / 10am CEST
Media Partners, Solar Media Events
June 3, 2026
National Exhibition and Convention Center (Shanghai)
Solar Media Events
June 16, 2026
Napa, USA