LONGi Solar secures second TUV Rheinland ‘PV Module Energy Yield Simulation Award’

March 27, 2018
Facebook
Twitter
LinkedIn
Reddit
Email
LONGi Solar President, Mr. Wenxue Li, accepts the PV module Energy Yield Simulation Award by TUV Rheinland. Image: LONGi Solar

‘Silicon Module Super League’ (SMSL) member LONGi Solar, subsidiary of LONGi Green Energy, the leading integrated monocrystalline PV manufacturer has received for the second year in a row an award from testing services firm TUV Rheinland  for “PV Module Energy Yield Simulation (Mono Group),” part of the “All Quality Matters” awards.

Wenxue Li, President of LONGi Solar said, “LONGi Solar has always been committed to giving to our customers the best products and services. This award is the result of objective measurement, and it also underlines the excellent performance of LONGi Solar mono modules with regard to energy yield. LONGi Solar will work harder to live up to your trust and expectations, make more reliable and efficient products, and provide customers with more cost-effective services.”

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

TUV Rheinland's Energy Yield evaluation tests require the simulations of climatic environments in five different regions worldwide – Cologne (Germany), Datong (China), Riyadh (Saudi Arabia), Chennai (India) and Los Angeles (USA). 

At the conclusion of the tests, LONGi Solar’s 60-cell mono module was named the best performing module and winner in the mono group.

LONGi Solar noted that it spent more than RMB 1.8 billion (US$285 million) on R&D activities in the past five years.

Read Next

November 17, 2025
Jakson Group has started Phase 1 construction of its 6GW integrated solar ingot, wafer, cell and module manufacturing facility at Maksi, Madhya Pradesh.
November 17, 2025
India’s race to 500GW is being slowed by critical grid bottlenecks, NTPC PMI’s Abhinav Jindal told PV Tech.
November 17, 2025
Saatvik Green Energy, through its subsidiary Saatvik Solar Industries, has secured solar PV module orders worth INR1.77 billion (US$19.9 million). 
November 17, 2025
US solar module manufacturer First Solar will build a new production facility in the state of South Carolina, which will bring its US nameplate manufacturing capacity to 17.7GW by 2027.
Premium
November 17, 2025
PV Talk: India’s race to 500GW of clean energy is being slowed by critical bottlenecks. NTPC PMI’s deputy general manager Abhinav Jindal tells Shreeyashi Ojha what steps India must urgently take to stay on track with its 2030 targets.
November 14, 2025
Lightsource bp has started construction on its 330MWp Valle 3 and 4 project in Wamba, Valladolid, in the Castilla y Leon region of Spain. 

Upcoming Events

Solar Media Events
November 25, 2025
Warsaw, Poland
Solar Media Events
December 2, 2025
Málaga, Spain
Solar Media Events
February 3, 2026
London, UK
Solar Media Events
March 24, 2026
Lisbon, Portugal
Solar Media Events
June 16, 2026
Napa, USA