LONGi’s Hi-MO 4 modules to power 50MW project in Vietnam

September 18, 2019
Facebook
Twitter
LinkedIn
Reddit
Email
The LONGi-DLG Solar deal concerns the 72-cell HI-MO 4 variant, with each panel designed with a maximum power output of 440W. (Image credit: LONGi Solar)

LONGi Solar has bagged yet another order for its high-efficiency module line Hi-MO 4, now set to power a utility-scale project in Vietnam.

The Chinese manufacturer unveiled this week a supply deal with the proponents of a 50MW project in the southeastern province of Ninh Thuan, set to cost US$50 million.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The work of developer DLG Solar, the PV scheme will stretch across a 60-hectare site and is designed to produce an annual output of 80GWh, LONGi explained in a statement.

“Vietnam is a key market for LONGi’s overseas strategic direction,” LONGi Solar senior vice president Mr Dennis She said in the statement. “We will provide high efficiency monocrystalline products with lower LCOE and affordable clean electricity for local enterprises and people based on the differentiated demands in Vietnam's PV market.”

The contract sees LONGi’s Hi-MO 4 modules reach new geographies after they were first launched in May 2019, coinciding with this year’s edition of Intersolar Europe.

Under a separate deal, the high-efficiency mono-PERC product will be provided – alongside with its HI-MO X counterpart – to distributed projects in Brazil and other key Latin American markets.

The agreement with Brazilian distributed specialist SICES commits LONGi to supplying the two HI-MO varieties at joint, annual volumes of 200MW.

The firm’s customer for the 50MW deal in Vietnam has opted for the 72-cell HI-MO 4 variant, with each panel designed with a maximum power output of 440W.

Having reached the 2GW sales mark over the summer, LONGi’s HI-MO 4 is now poised to expand to new regions, with European availability understood to be following in Q4 2019.

Vietnam has witnessed utility-scale solar momentum since legislating for generous feed-in tariffs, prompting a gigawatt-scale rush of installations to reap subsidies before a deadline this year.

The developer stampede risks driving grid congestion across the most sought-after solar locations such as Vietnam’s south, the country’s monopoly utility EVN has warned.

Read Next

Sponsored
April 24, 2026
PV Tech spoke to Ricky Chen, President of Huawei Asia Pacific Smart PV & ESS Business, about FusionSolar9.0's role in enabling higher-quality solar deployment
April 23, 2026
The Global Solar Council has announced a new management and strategy board drawn from across the solar and storage industries.
April 22, 2026
Exports of Chinese solar products hit a record 68GW in March 2026, a figure that is equivalent to Spain’s entire solar PV capacity.
April 22, 2026
Chinese PV manufacturer Aiko has issued two major announcements regarding its plans to accelerate production of its high-efficiency all-back-contact (ABC) technology.
April 21, 2026
According to Ember's Global Electricity Review 2026, renewables accounted for 33.8% of global power generation in 2025.
April 20, 2026
Solar PV accounted for more than a quarter of total global energy demand growth in 2025, becoming the single largest contributor to new energy supply, according to the International Energy Agency.

Upcoming Events

Upcoming Webinars
May 27, 2026
9am BST / 10am CEST
Media Partners, Solar Media Events
June 3, 2026
National Exhibition and Convention Center (Shanghai)
Solar Media Events
June 16, 2026
Napa, USA
Solar Media Events
October 13, 2026
San Francisco Bay Area, USA
Solar Media Events
November 3, 2026
Málaga, Spain