Intevac’s order backlog boosted by recent solar ion implant orders

Facebook
Twitter
LinkedIn
Reddit
Email
Revenue in the first quarter of 2017 was US$30.4 million, including US$21.5 million of Thin-film Equipment segment revenue. Image: Intevac

Specialist semiconductor and PV equipment supplier Intevac reported first quarter 2017 financial results that included a 40% increase in new orders, driven by its largest single order in its Thin-film Equipment segment that includes its solar product offerings with a 12 system follow-on order in March for its solar ‘ENERGi’ implant tools. 

Revenue in the first quarter of 2017 was US$30.4 million, including US$21.5 million of Thin-film Equipment segment revenue. However, the segment sales are not expected to include the solar ion implant order until later in the year, after tools are shipped to a customer in China planning to ramp N-type mono IBC (Interdigitated Back Contact) solar cells and modules, including bifacial modules. 

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Management noted in its first quarter earnings call that the solar ion implant order was valued at around US$23 million. The company had not disclosed the value of the order when it was announced in March, 2017.

Intevac’s Thin-film Equipment segment sales have been increasing significantly since the third quarter of 2016, partially driven by new solar orders for implant and PVD tools. Intevac reported total new orders in the quarter of US$35 million

The order backlog at the end of the first quarter of 2017 included one ‘MATRIX’ solar system and 14 ENERGi solar ion implant systems.

“Recent traction in orders and revenue in new markets reflect important milestones in the future growth trajectory of our company,” commented Wendell Blonigan, president and chief executive officer of Intevac. “In the first quarter, we recognized revenue on VERTEX volume production systems and received follow-on orders for 12 ENERGi implant tools, both of which represent the crossover from pilot tools to capacity production systems in each of our new Thin-film Equipment growth markets.

Intevac reported that its order backlog totalled US$73.0 million at the end of the first quarter, compared to US$68.5 million at the end of 2016. The order backlog at the end of the first quarter of 2017 included one ‘MATRIX’ PVD solar system and 14 ENERGi solar ion implant systems.

Blonigan noted in the earnings call that the market for its MATRIX solar product would remain limited, due to sector challenges.

“We believe that many customers have been reassessing their N-type strategies and some high efficiency N-type capacity has been announced coming offline. We continue to expect the market for our MATRIX solar products focused on high efficiency N-type cells will be soft over the next year and until overall weakness in the solar module pricing has improved,” noted Blonigan.

“While there are many moving parts in the solar business, we continue to monitor the environment for N-type solar investments and given the nearly $23 million order just received, we are leaving our five year solar revenue outlook unchanged at $175 million,” added Blonigan.

20 April 2027
Istanbul, Türkiye
PV Tech has been running PV CellTech Conferences since 2016. PV CellTech Global, on 20-21 April 2027, is the meeting place for everyone invested in the growth of PV manufacturing and advancement in cell technologies, which will drive us towards the installed capacity required to power the planet by 2050. This is a gathering of key stakeholders driving capital expenditure and technologies for new PV manufacturing plants across the globe to harness the opportunities the growth of PV represents out to 2050 and beyond. The conference takes place in one conference room, where all senior peers have the same shared experience of learning and unique insight, unmatched anywhere else in the solar industry events calendar.

Read Next

Sponsored
October 27, 2026
Tongwei Solar's TNC 2.0 FULLX G12R-48 is designed for rooftop applications with varying available space and aesthetic requirements.
October 27, 2026
Caelux has signed an agreement with Indian PV manufacturer INA Solar to produce 3GW of perovskite-silicon ‘hybrid tandem’ modules.
October 26, 2026
Aiko Solar has revealed a return to profitability in the third quarter of this year and released details of a major technology upgrade to its PERC production line.
October 7, 2026
India’s MNRE proposed standardised ALMM List-II solar PV cell nomenclature, introducing 14-character codes.
Premium
October 2, 2026
PV Talk: PV Tech spoke with Dana Hankey about restarting ACI Materials' silver paste production for US solar manufacturing.
September 21, 2026
A Chinese satellite carrying prototype heterojunction solar modules produced by the leading PV manufacturer JA has been launched into Earth’s orbit.

Upcoming Events

Solar Media Events
November 3, 2026
Málaga, Spain
Solar Media Events
November 24, 2026
Warsaw, Poland
Solar Media Events
February 2, 2027
London, UK
Solar Media Events
April 20, 2027
Istanbul, Türkiye