US begins WRO enforcement in earnest with solar modules detained by customs officials, say reports

August 18, 2021
Facebook
Twitter
LinkedIn
Reddit
Email
US Customs and Border Protection is alleged to have seized module shipments from numerous manufacturers. Image: Pixabay.

Reports have emerged alleging that US officials have begun detaining solar module shipments suspected of infringing the withhold and release order (WRO) implemented in June.

The WRO, which effectively blocks the import of silicon metal from Hoshine Silicon Industry and its subsidiaries, as well as solar products suspected of containing silicon products manufactured by Hoshine, is enforced by US Customs and Border Protection.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Yesterday ROTH Capital reported that some manufacturers – namely JinkoSolar, Canadian Solar and Trina Solar – have had modules detained in recent weeks. While Canadian Solar and Trina Solar are alleged to have had sample modules detained, JinkoSolar is reported to have had upwards of 100MW of solar module shipments held by customs officials. Credit Suisse has also reported that JinkoSolar has been beset by module detainments.

JinkoSolar declined to comment when contacted by PV Tech, while Canadian Solar and Trina Solar have yet to respond to requests for comment at the time of publication.

The US Department of Commerce and US Customs and Border Protection had also yet to respond to requests for comment by PV Tech.

During a conference call with analysts held after its Q2 results disclosure last week, Yan Zhuang, president of Canadian Solar’s manufacturing arm, said the company had been working hard to deal with the prospect of the WRO and insisted Canadian Solar was “pretty confident that we can overcome that constraint”.

Shares in both JinkoSolar and Canadian Solar fell by around 6% yesterday.

As detailed by PV Tech Premium in June, in the event of shipments being detained the importer has three months to either submit documentation proving the WRO does not apply to its products or arrange for them to be re-exported. After those three months, if products are still under question the importer has 60 days to arrange for their re-export, and if products remain at the port of entry after that period they are deemed abandoned and destroyed.

The news of WRO enforcement comes amidst a flurry of activity pertaining to trade relations between the US and China, with solar PV finding itself the subject of much attention. Yesterday also saw petitions filed on behalf of an alliance of US solar manufacturers alleging Chinese solar companies were circumventing antidumping and countervailing duties through the use of entities based in Malaysia, Vietnam and Thailand, with the express likelihood that petitions filed with the US Department of Commerce could result in such duties being extended to include Southeast Asian nations.

Meanwhile an amendment to the budget reconciliation bill currently passing through the US Senate tabled by Republican senator Dan Sullivan which seeks to ban renewables projects using technology developed in China from claiming federal funds and subsidies received considerable support from the Senate, however the overall bill remains some way from passing into law.  

Read Next

December 1, 2025
Multinational solar manufacturer Canadian Solar will assume direct control of its US solar PV and energy storage manufacturing operations, in a strategic move which may reduce its supply chain risks.
Premium
December 1, 2025
Steven Xuereb of Kiwa PI Berlin discusses the PV industry’s progress in addressing performance and reliability concerns around TOPCon technology.
November 28, 2025
LONGi has acquired system integrator PotisEdge, and plans to launch an ‘Energy Storage One-Stop Solution’.
November 28, 2025
Chinese module manufacturer Huasun Energy has launched a new heterojunction module with a 760 W output, a 2,000 V system voltage and 24.5% module efficiency.
Premium
November 27, 2025
Prateek Tare tells PV Tech Premium how Distributed Energy Infrastructure transformed a Superfund site into the Acton PV-plus-storage project.
November 27, 2025
RWE Clean Energy has commissioned the 200MW Stoneridge Solar PV project in Texas, which is co-located with a 100MW/200MWh BESS.

Upcoming Events

Solar Media Events
December 2, 2025
Málaga, Spain
Upcoming Webinars
December 4, 2025
2pm GMT / 3pm CET
Upcoming Webinars
December 17, 2025
2pm GMT / 3pm CET
Solar Media Events
February 3, 2026
London, UK
Solar Media Events
March 24, 2026
Dallas, Texas